PEARL III: Principles of Lean Software Development for Agile Methodology
The market for software is fast paced with frequently changing customer needs. In order to stay competitive companies have to be able to react to the changing needs in a rapid manner. Failing to do so often results in a higher risk of market lock-out , reduced probability of market dominance , and it is less likely that the product conforms to the needs of the market. In consequence software companies need to take action in order to be responsive whenever there is a shift in the customers’ needs on the market. That is, they need to meet the current requirements of the market, the requirements being function or quality related. Two development paradigms emerged in the last decade to address this challenge, namely agile and lean software development.
The term Lean Software Development was first coined as the title for a conference organized by the ESPRIT initiative of the European Union, in Stuttgart Germany, October 1992. Independently, the following year, Robert Charette in 1993 suggested the concept of “Lean Software Development” as part of his work exploring better ways of managing risk in software projects. The term “Lean” dates to 1991, suggested by James Womack, Daniel Jones, and Daniel Roos, in their book The Machine That Changed the World: The Story of Lean Production as the English language term to describe the management approach used at Toyota. The idea that Lean might be applicable in software development was established very early, only 1 to 2 years after the term was first used in association with trends in manufacturing processes and industrial engineering.
In their 2nd book, published in 1995, Womack and Jones defined five core pillars of Lean Thinking. These were:
- Value
- Value Stream
- Flow
- Pull
- Perfection
This became the default working definition for Lean over most of the next decade. The pursuit of perfection, it was suggested, was achieved by eliminating waste. While there were 5 pillars, it was the 5th one, pursuit of perfection through the systemic identification of wasteful activities and their elimination, that really resonated with a wide audience. Lean became almost exclusively associated with the practice of elimination of waste through the late 1990s and the early part of the 21st Century.
The Womack and Jones definition for Lean is not shared universally. The principles of management at Toyota are far more subtle. The single word “waste” in English is described more richly with three Japanese terms:
- Muda – literally meaning “waste” but implying non-value-added activity
- Mura – meaning “unevenness” and interpreted as “variability in flow”
- Muri – meaning “overburdening” or “unreasonableness”
Perfection is pursued through the reduction of non-value-added activity but also through the smoothing of flow and the elimination of overburdening. In addition, the Toyota approach was based in a foundational respect for people and heavily influenced by the teachings of 20th century quality assurance and statistical process control experts such as W. Edwards Deming.
Unfortunately, there are almost as many definitions for Lean as there are authors on the subject.
Lean and Agile
that the use of these methods is partly a metaphor rather than a direct copying. For example, kanban in factories literally is a binary signal to replenish an inventory buffer, based on what the customer has taken away. In software it performs a similar function, but more broadly displays information on the status of the process and potential problems.
Moving upstream and applying lean thinking to influence project selection and definition also creates great benefits .
Defining Lean Software Development
There are several schools of thought within Lean Software Development. The largest, and arguably leading, school is the Lean Systems Society, which includes Donald Reinertsen, Jim Sutton, Alan Shalloway, Bob Charette, Mary Poppendeick, and David J. Anderson. Mary and Tom Poppendieck’s work developed prior to the formation of the Society and its credo stands separately, as does the work of Craig Larman, Bas Vodde , and, most recently, Jim Coplien . This section seeks to be broadly representative of the Lean Systems Society viewpoint as expressed in its credo and to provide a synthesis and summary of their ideas.
Values
- Accept the human condition
- Accept that complexity & uncertainty are natural to knowledge work
- Work towards a better Economic Outcome
- While enabling a better Sociological Outcome
- Seek, embrace & question ideas from a wide range of disciplines
- A values-based community enhances the speed & depth of positive change
Accept the Human Condition
Accept that Complexity & Uncertainty are Natural to Knowledge Work
Work towards a better Economic Outcome
Enable a better Sociological Outcome
Principles of Lean Software Development for Scaling Agile
- Follow a Systems Thinking & Design Approach
- Emergent Outcomes can be Influenced by Architecting the Context of a Complex Adaptive System
- Respect People (as part of the system)
- Use the Scientific Method (to drive improvements)
- Encourage Leadership
- Generate Visibility (into work, workflow, and system operation)
- Reduce Flow Time
- Reduce Waste to Improve Efficiency
Follow a Systems Thinking & Design Approach
A Lean Systems Thinking and Design Approach requires that we consider the demands on the system made by external stakeholders, such as customers, and the desired outcome required by those stakeholders. We must study the nature of demand and compare it with the capability of our system to deliver. Demand will include so-called “value demand,” for which customers are willing to pay, and “failure demand,” which is typically rework or additional demand caused by a failure in the supply of value demand. Failure demand often takes two forms: rework on previously delivered value demand and additional services or support due to a failure in supplying value demand. In software development, failure demand is typically requests for bug fixes and requests to a customer care or help desk function.
A systems design approach requires that we also follow the Plan-Do-Study-Act (PDSA) approach to process design and improvement. W. Edwards Deming used the words “study” and “capability” to imply that we study the natural philosophy of our system’s behavior. This system consists of our software development process and all the people operating it. It will have an observable behavior in terms of lead time, quality, quantity of features or functions delivered (referred to in Agile literature as “velocity”), and so forth.
Velocity : At the end of each iteration, the team adds up effort estimates associated with user stories that were completed during that iteration. This total is called velocity.
Knowing velocity, the team can compute (or revise) an estimate of how long the project will take to complete, based on the estimates associated with remaining user stories and assuming that velocity over the remaining iterations will remain approximately the same. This is generally an accurate prediction, even though rarely a precise one.
“Lead time” is a term borrowed from the manufacturing method known as Lean or Toyota Production System, where it is defined as the time elapsed between a customer placing an order and receiving the product ordered.
Translated to the software domain, lead time can be described more abstractly as the time elapsed between the identification of a requirement and its fulfillment. Defining a more concrete measurement depends on the situation being examined: for instance, when focusing on the software development process, the “lead time” elapsed between the formulation of a user story and that story being used “in production”, that is, by actual users under normal conditions.
Teams opting for the kanban approach favor this measure, over the better known velocity. Instead of aiming at increasing velocity, improvement initiatives intend to reduce lead time.
These metrics will exhibit variability and, by studying the mean and spread of variation, Individuals can develop an understanding of their capability. If this is mismatched with the demand and customer expectations, then the system will need to be redesigned to close the gap.
Deming also taught that capability is 95% influenced by system design, and only 5% is contributed by the performance of individuals. In other words, we can respect people by not blaming them for a gap in capability compared to demand and by redesigning the system to enable them to be successful.
To understand system design, we must have a scientific understanding of the dynamics of system capability and how it might be affected. Models are developed to predict the dynamics of the system. While there are many possible models, several popular ones are in common usage: the understanding of economic costs; so-called transaction and coordination costs that relate to production of customer-valued products or services; the Theory of Constraints – the understanding of bottlenecks; and The Theory of Profound Knowledge – the study and recognition of variability as either common to the system design or special and external to the system design.
Emergent Outcomes can be Influenced by ARCHITECTURE of the Context for a Complex Adaptive System
In software development processes, the “simple rules” of complex adaptive systems are the policies that make up the process definition. The core principle here is based in the belief that developing software products and services is not a deterministic activity, and hence a defined process that cannot adapt itself will not be an adequate response to unforeseeable events. Hence, the process designed as part of our system thinking and design approach must be adaptable. It adapts through the modification of the policies of which it is made.
The Kanban approach to Lean Software Development utilizes this concept by treating the policies of the kanban pull system as the “simple rules,” and the starting conditions are that work and workflow is visualized, that flow is managed using an understanding of system dynamics, and that the organization uses a scientific approach to understanding, proposing, and implementing process improvements.
The term “kanban” with the sense of a sign, poster or billboard, and derived from roots which literally translate as “visual board”.
Its meaning within the Agile context is borrowed from the Toyota Production System, where it designates a system to control the inventory levels of various parts. It is analogous to (and in fact inspired by) cards placed behind products on supermarket shelves to signal “out of stock” items and trigger a resupply “just in time”.
The Toyota system affords a precise accounting of inventory or “work in process”, and strives for a reduction of inventory levels, considered wasteful and harmful to performance.
The phrase “Kanban method” also refers to an approach to continuous improvement which relies on visualizing the current system of work scheduling, managing “flow” as the primary measure of performance, and whole-system optimization – as a process improvement approach, it does not prescribe any particular practices.
Respect People
Use the Scientific Method
The Lean Software & Systems community uses statistical methods such as statistical process control charts and spectral analysis histograms of raw data for lead time and velocity to understand system capability. They also use models such as: the Theory of Constraints to understand bottlenecks; The System of Profound Knowledge to understand variation that is internal to the system design versus that which is externally influenced; and an analysis of economic costs in the form of tasks performed to merely coordinate, set up, deliver, or clean up after customer-valued product or services are created. Some other models are coming into use, such as Real Option Theory, which seeks to apply financial option theory from financial risk management to real-world decision making.
The scientific method suggests: we study; we postulate an outcome based on a model; we perturb the system based on that prediction; and we observe again to see if the perturbation produced the results the model predicted. If it doesn’t, then we check our data and reconsider whether our model is accurate. Using models to drive process improvements moves it to a scientific activity and elevates it from a superstitious activity based on intuition.
Encourage Leadership
Generate Visibility
Reduce Flow Time
Lead time clock starts when the request is made and ends at delivery. Cycle time clock starts when work begins on the request and ends when the item is ready for delivery. Cycle time is a more mechanical measure of process capability. Lead time is what the customer sees.
Lead time depends on cycle time, but also depends on your willingness to keep a backlog, the customer’s patience, and the customer’s readiness for delivery.
Focusing on the time work takes to flow through the process is important in several ways. Longer cycle times have been shown to correlate with a non-linear growth in bug rates. Hence shorter cycle times lead to higher quality. This is counter-intuitive as it seems ridiculous that bugs could be inserted in code while it is queuing and no human is actually touching it. Traditionally, the software engineering profession and academics who study it have ignored this idle time. However, empirical evidence suggests that cycle time is important to initial quality.
Alan Shalloway has also talked about the concept of “induced work.” His observation is that a lag in performing a task can lead to that task taking a lot more effort than it may have done. For example, a bug found and fixed immediately may only take 20 minutes to fix, but if that bug is triaged, is queued and then waits for several days or weeks to be fixed, it may involve several or many hours to make the fix. Hence, the cycle time delay has “induced” additional work. As this work is avoidable, in Lean terms, it must be seen as “waste.”
The third reason for focusing on cycle time is a business related reason. Every feature, function, or user story has a value. That value may be uncertain but, nevertheless, there is a value. The value may vary over time. The concept of value varying over time can be expressed economically as a market payoff function. When the market payoff function for a work item is understood, even if the function exhibits a spread of values to model uncertainty, it is possible to evaluate a “cost of delay.” The cost of delay allows us to put a value on reducing cycle time.
With some work items, the market payoff function does not start until a known date in the future. For example, a feature designed to be used during the 4th of July holiday in the United States has no value prior to that date. Shortening cycle time and being capable of predicting cycle time with some certainty is still useful in such an example. Ideally, we want to start the work so that the feature is delivered “just in time” when it is needed and not significantly prior to the desired date, nor late, as late delivery incurs a cost of delay. Just-in-time delivery ensures that optimal use was made of available resources. Early delivery implies that we might have worked on something else and have, by implication, incurred an opportunity cost of delay.
As a result of these three reasons, Lean Software Development seeks to minimize flow time and to record data that enables predictions about flow time. The objective is to minimize failure demand from bugs, waste from over-burdening due to delay in fixing bugs, and to maximize value delivered by avoiding both cost of delay and opportunity cost of delay.
Reduce Waste to Improve Efficiency
For every valued-added activity, there are setup, cleanup and delivery activities that are necessary but do not add value in their own right. For example, a project iteration that develops an increment of working software requires planning (a setup activity), an environment and perhaps a code branch in version control (collectively known as configuration management and also a setup activity), a release plan and performing the actual release (a delivery activity), a demonstration to the customer (a delivery activity), and perhaps an environment teardown or reconfiguration (a cleanup activity.) In economic terms, the setup, cleanup, and delivery activities are transaction costs on performing the value-added work. These costs (or overheads) are considered waste in Lean.
Any form of communication overhead can be considered waste. Meetings to determine project status and to schedule or assign work to team members would be considered a coordination cost in economic language. All coordination costs are waste in Lean thinking. Lean software development methods seek to eliminate or reduce coordination costs through the use of colocation of team members, short face-to-face meetings such as standups, and visual controls such as card walls.
The third common form of waste in Lean Software Development is failure demand. Failure demand is a burden on the system of software development. Failure demand is typically rework or new forms of work generated as a side-effect of poor quality. The most typical forms of failure demand in software development are bugs, production defects, and customer support activities driven out of a failure to use the software as intended. The percentage of work-in-progress that is failure demand is often referred to as Failure Load. The percentage of value-adding work against failure demand is a measure of the efficiency of the system.
The percentage of value-added work against the total work, including all the non-value adding transaction and coordination costs, determines the level of efficiency. A system with no transaction and coordination costs and no failure load would be considered 100% efficient.
Traditionally, Western management science has taught that efficiency can be improved by increasing the batch size of work. Typically, transaction and coordination costs are fixed or rise only slightly with an increase in batch size. As a result, large batches of work are more efficient. This concept is known as “economy of scale.” However, in knowledge work problems, coordination costs tend to rise non-linearly with batch size, while transaction costs can often exhibit a linear growth. As a result, the traditional 20th Century approach to efficiency is not appropriate for knowledge work problems like software development.
It is better to focus on reducing the overheads while keeping batch sizes small in order to improve efficiency. Hence, the Lean way to be efficient is to reduce waste. Lean software development methods focus on fast, cheap, and quick planning methods; low communication overhead; and effective low overhead coordination mechanisms, such as visual controls in kanban systems. They also encourage automated testing and automated deployment to reduce the transaction costs of delivery. Modern tools for minimizing the costs of environment setup and teardown, such as modern version control systems and use of virtualization, also help to improve efficiency of small batches of software development.
Lean Software Development Practices for Agile
Lean Software Development does not prescribe practices. It is more important to demonstrate that actual process definitions are aligned with the principles and values. However, a number of practices are being commonly adopted. This section provides a brief overview of some of these.
Continuous learning
Software development is a continuous learning process with the additional challenge of development teams and end product sizes. The best approach for improving a software development environment is to amplify learning. The accumulation of defects should be prevented by running tests as soon as the code is written. Instead of adding more documentation or detailed planning, different ideas could be tried by writing code and building. The process of user requirements gathering could be simplified by presenting screens to the end-users and getting their input.
The learning process is sped up by usage of short iteration cycles – each one coupled with refactoring and integration testing. Refactoring consists of improving the internal structure of an existing program’s source code, while preserving its external behavior. The noun “refactoring” refers to one particular behaviour-preserving transformation, such as “Extract Method” or “Introduce Parameter”. Refactoring does “not” mean: rewriting code, fixing bugs or improve observable aspects of software such as its interface
Refactoring in the absence of safeguards against introducing defects (i.e. violating the “behaviour preserving” condition) is risky. Safeguards include aids to regression testing including automated unit tests or automated acceptance tests, and aids to formal reasoning such as type systems.
Increasing feedback via short feedback sessions with customers helps when determining the current phase of development and adjusting efforts for future improvements. During those short sessions both customer representatives and the development team learn more about the domain problem and figure out possible solutions for further development. Thus the customers better understand their needs, based on the existing result of development efforts, and the developers learn how to better satisfy those needs. Another idea in the communication and learning process with a customer is set-based development – this concentrates on communicating the constraints of the future solution and not the possible solutions, thus promoting the birth of the solution via dialogue with the customer.
Decide as late as possible
As software development is always associated with some uncertainty, better results should be achieved with an options-based approach, delaying decisions as much as possible until they can be made based on facts and not on uncertain assumptions and predictions. The more complex a system is, the more capacity for change should be built into it, thus enabling the delay of important and crucial commitments. The iterative approach promotes this principle – the ability to adapt to changes and correct mistakes, which might be very costly if discovered after the release of the system.
An agile software development approach can move the building of options earlier for customers, thus delaying certain crucial decisions until customers have realized their needs better. This also allows later adaptation to changes and the prevention of costly earlier technology-bounded decisions. This does not mean that no planning should be involved – on the contrary, planning activities should be concentrated on the different options and adapting to the current situation, as well as clarifying confusing situations by establishing patterns for rapid action. Evaluating different options is effective as soon as it is realized that they are not free, but provide the needed flexibility for late decision making.
Deliver as fast as possible
In the era of rapid technology evolution, it is not the biggest that survives, but the fastest. The sooner the end product is delivered without major defects, the sooner feedback can be received, and incorporated into the next iteration. The shorter the iterations, the better the learning and communication within the team. With speed, decisions can be delayed. Speed assures the fulfilling of the customer’s present needs and not what they required yesterday. This gives them the opportunity to delay making up their minds about what they really require until they gain better knowledge. Customers value rapid delivery of a quality product.
The just-in-time production ideology could be applied to software development, recognizing its specific requirements and environment. This is achieved by presenting the needed result and letting the team organize itself and divide the tasks for accomplishing the needed result for a specific iteration. At the beginning, the customer provides the needed input. This could be simply presented in small cards or stories – the developers estimate the time needed for the implementation of each card. Thus the work organization changes into self-pulling system – each morning during a stand-up meeting, each member of the team reviews what has been done yesterday, what is to be done today and tomorrow, and prompts for any inputs needed from colleagues or the customer. This requires transparency of the process, which is also beneficial for team communication.
Another key idea in Toyota’s Product Development System is set-based design. If a new brake system is needed for a car, for example, three teams may design solutions to the same problem. Each team learns about the problem space and designs a potential solution. As a solution is deemed unreasonable, it is cut. At the end of a period, the surviving designs are compared and one is chosen, perhaps with some modifications based on learning from the others – a great example of deferring commitment until the last possible moment. Software decisions could also benefit from this practice to minimize the risk brought on by big up-front design
Empower the team
There has been a traditional belief in most businesses about the decision-making in the organization – the managers tell the workers how to do their own job. In a “Work-Out technique”, the roles are turned – the managers are taught how to listen to the developers, so they can explain better what actions might be taken, as well as provide suggestions for improvements. The lean approach favors the aphorism “find good people and let them do their own job,” encouraging progress, catching errors, and removing impediments, but not micro-managing.
Another mistaken belief has been the consideration of people as resources. People might be resources from the point of view of a statistical data sheet, but in software development, as well as any organizational business, people do need something more than just the list of tasks and the assurance that they will not be disturbed during the completion of the tasks. People need motivation and a higher purpose to work for – purpose within the reachable reality, with the assurance that the team might choose its own commitments. The developers should be given access to the customer; the team leader should provide support and help in difficult situations, as well as ensure that skepticism does not ruin the team’s spirit.
Build integrity in
The customer needs to have an overall experience of the System – this is the so-called perceived integrity: how it is being advertised, delivered, deployed, accessed, how intuitive its use is, price and how well it solves problems.
Conceptual integrity means that the system’s separate components work well together as a whole with balance between flexibility, maintainability, efficiency, and responsiveness. This could be achieved by understanding the problem domain and solving it at the same time, not sequentially. The needed information is received in small batch pieces – not in one vast chunk with preferable face-to-face communication and not any written documentation. The information flow should be constant in both directions – from customer to developers and back, thus avoiding the large stressful amount of information after long development in isolation.
One of the healthy ways towards integral architecture is refactoring. As more features are added to the original code base, the harder it becomes to add further improvements. Refactoring is about keeping simplicity, clarity, minimum amount of features in the code. Repetitions in the code are signs for bad code designs and should be avoided. The complete and automated building process should be accompanied by a complete and automated suite of developer and customer tests, having the same versioning, synchronization and semantics as the current state of the System. At the end the integrity should be verified with thorough testing, thus ensuring the System does what the customer expects it to. Automated tests are also considered part of the production process, and therefore if they do not add value they should be considered waste. Automated testing should not be a goal, but rather a means to an end, specifically the reduction of defects.
See the whole
Software systems nowadays are not simply the sum of their parts, but also the product of their interactions. Defects in software tend to accumulate during the development process – by decomposing the big tasks into smaller tasks, and by standardizing different stages of development, the root causes of defects should be found and eliminated. The larger the system, the more organizations that are involved in its development and the more parts are developed by different teams, the greater the importance of having well defined relationships between different vendors, in order to produce a system with smoothly interacting components. During a longer period of development, a stronger subcontractor network is far more beneficial than short-term profit optimizing, which does not enable win-win relationships.
Lean thinking has to be understood well by all members of a project, before implementing in a concrete, real-life situation. “Think big, act small, fail fast; learn rapidly” – these slogans summarize the importance of understanding the field and the suitability of implementing lean principles along the whole software development process. Only when all of the lean principles are implemented together, combined with strong “common sense” with respect to the working environment, is there a basis for success in software development.
Cumulative Flow Diagrams
In their most basic form, cumulative flow diagrams are used to visualize the quantity of work-in-progress at any given step in the work item lifecycle. This can be used to detect bottlenecks and observe the effects of “mura” (variability in flow).
Visual Controls
Virtual Kanban Systems
In Lean Software Development, the kanban are virtual and often tracked by setting a maximum number for a given step in the workflow of a work item type. In some implementations, electronic systems keep track of the virtual kanban and provide a signal when new work can be started. The signal can be visual or in the form of an alert such as an email.
Virtual kanban systems are often combined with visual controls to provide a visual virtual kanban system representing the workflow of one or several work item types. Such systems are often referred to as “kanban boards” or “electronic kanban systems.” A visual virtual kanban system is available as a plug-in for Team Foundation Server, called Visual WIP[20]. This project was developed as open source by Hakan Forss in Sweden.
Small Batch Sizes / Single-piece Flow
Small batches and single-piece flow require frequent interaction with business owners to replenish the backlog or queue or work. They also require a capability to release frequently. To enable frequent interaction with business people and frequent delivery, it is necessary to shrink the transaction and coordination costs of both activities. A common way to achieve this is the use of automation.
Automation
Kaizen Events
The Lean concept of Kaizen also has a strong influence on the way Agile is being practiced, filling a gap relating to continuous improvement
Lean Software Development processes use several different activities to generate kaizen events. These are listed here. Each of these activities is designed to stimulate a conversation about problems that adversely affect capability and, consequently, ability to deliver against demand. The essence of kaizen in knowledge work is that we must provoke conversations about problems across groups of people from different teams and with different skills.
The evolution of Agile is primarily focused on evolving the product toward a better fit with requirements. In Agile, both the product and the requirements are refined as more is known through experience. Kaizen, a continuous improvement method used in Lean, focuses on the development process itself. When Kaizen is practiced in an Agile project, the participants not only suggest ways to improve the fit between the product and the requirements but also offer ways to improve the process being used, something usually not emphasized in Agile methods. Eckfeldt described the use of Kaizen snakes and project thermometers to capture process improvement feedback.
Daily standup meetings
Retrospectives
Retrospectives typically use an anecdotal approach to reflection by asking questions like “what went well?”, “what would we do differently?”, and “what should we stop doing?”
Retrospectives typically produce a backlog of suggestions for kaizen events. The team may then prioritize some of these for implementation.
A retrospective is intended to reveal facts or feelings which have measurable effects on the team’s performance, and to construct ideas for improvement based on these observations. It will not be useful if it devolves into a verbal joust, or a whining session.
On the other hand, an effective retrospective requires that each participant feel comfortable speaking up. The facilitator is responsible for creating the conditions of mutual trust; this may require taking into accounts such factors as hierarchical relationships, the presence of a manager for instance may inhibit discussion of performance issues.
Being an all-hands meeting, a retrospective comes at a significant cost in person-hours. Poor execution, either from the usual causes of bad meetings (lack of preparation, tardiness, inattention) or from causes specific to this format (lack of trust and safety, taboo topics), will result in the practice being discredited, even though a vast majority of the Agile community views it as valuable.
An effective retrospective will normally result in decisions, leading to action items; it’s a mistake to have too few (there is always room for improvement) or too many (it would be impractical to address “all” issues in the next iteration). One or two improvement ideas per iteration retrospective may well be enough.
Identical issues coming up at each retrospective, without measurable improvement over time, may signal that the retrospective has become an empty ritual
Operations Reviews
An operations review will provoke discussions about the dynamics affecting performance between teams. Perhaps one team generates failure demand that is processed by another team? Perhaps that failure demand is disruptive and causes the second team to miss their commitments and fail to deliver against expectations? An operations review provides an opportunity to discuss such issues and propose changes. Operations reviews typically produce a small backlog of potential kaizen events that can be prioritized and scheduled for future implementation.
There is no such thing as a single Lean Software Development process. A process could be said to be Lean if it is clearly aligned with the values and principles of Lean Software Development. Lean Software Development does not prescribe any practices, but some activities have become common. Lean organizations seek to encourage kaizen through visualization of workflow and work-in-progress and through an understanding of the dynamics of flow and the factors (such as bottlenecks, non-instant availability, variability, and waste) that affect it. Process improvements are suggested and justified as ways to reduce sources of variability, eliminate waste, improve flow, or improve value delivery or risk management. As such, Lean Software Development processes will always be evolving and uniquely tailored to the organization within which they evolve. It will not be natural to simply copy a process definition from one organization to another and expect it to work in a different context. It will also be unlikely that returning to an organization after a few weeks or months to find the process in use to be the same as was observed earlier. It will always be evolving.
The organization using a Lean software development process could be said to be Lean if it exhibited only small amounts of waste in all three forms (“mura,” “muri,” and “muda”) and could be shown to be optimizing the delivery of value through effective management of risk. The pursuit of perfection in Lean is always a journey. There is no destination. True Lean organizations are always seeking further improvement.
Lean Software Development is still an emerging field, and we can expect it to continue to evolve over the next decade.
Lean software development at BBC WorldWide
The lean ideas behind the Toyota production system can be applied to software project
management. This paragraph explains the investigation of the performance of a nine-person software development team employed by BBC Worldwide based in London. The data collected in 2009 involved direct observations of the development team, the kanban boards, the daily stand-up meetings, semistructured interviews with a wide variety of staff, and statistical analysis. The evidence shows that over the 12-month period, lead time to deliver software improved by 37%, consistency of delivery rose by 47%, and defects reported by customers fell 24%. The significance of this work is showing that the use of lean methods including visual management, team-based problem solving, smaller batch sizes, and statistical process control can improve software development. It also summarizes key differences between agile and lean approaches to software development.
The conclusion is that the performance of the software development team was improved by adopting a lean approach. The faster delivery with a focus on creating the highest value to the customer also reduced both technical and market risks.
Lean software development at IMVU INc
IMVU Inc. (www.imvu.com) is a virtual company where users meet as personalized avatars in 3D digital rooms. Founded in 2004, IMVU has 25 million registered users, 100,000 registered developers and reached $1 million in monthly revenue. Over 90 percent of IMVU‘s revenue is from the direct sale of virtual credits (a form of currency) to users who purchase digital products from its 1.8 million item digital catalog. IMVU has won the 2008 Virtual Worlds Innovation Award and was also named a Rising Star in the 2008 Silicon Valley Technology Fast 50 program. IMVU receives funding from top venture investors Menlo Ventures, Allegis Capital and Bridgescale Partners. Its offices are located in Palo Alto, CA. (http://crunchbase.com/company/imvu)
Software Development at IMVU
IMVU‘s founders had previously founded There.com—a virtual world startup that took three years to build, burned through a ton of money, and was an abysmal failure after launch. However, from an engineering perspective, There.com was an amazing success, as they built it ahead of schedule, maintained tight quality standards, and solved multiple difficult technical problems. Still, it wasn‘t a commercial success—and large amounts of time and money were wasted. As a result, IMVU‘s founding team decided to build the minimum viable product and then test it with users—even if the product seemed only half-built (an engineer‘s nightmare).
As a result, IMVU was one of the startups that pioneered the ―build-just-a-little-and-get-customer-feedback model. This model was only possible because of the application of several lean principles at the technical level in the development process.
Lean Principle #1: Specify Value in the Eyes of the Customer
From the beginning, IMVU‘s founders decided they wanted to build a culture of ―ship, ship, ship. From a business perspective, this makes a lot of sense, but from an engineering perspective, it‘s like pulling fingernails with a pair of rusty pliers:―Bugs were all over the place, extremely ugly looking, and only the most rudimentary features.
In essence, releasing a sub-par product allowed IMVU to avoid over-production wastes by putting man hours only into features their customers liked.
Lean Principle #2: Identify Value Stream and Eliminate Waste
The IMVU team worked hard to cultivate the ―ship, ship, ship mentality. For example, on their very first day, most developers were expected to write some code and push it into production. Even though it was generally just a small bug fix or a miniscule feature, this ―release-code-on-the-first-day-of-work idea seemed revolutionary for most new hires.
Continuous deployment reduced the wastes of overproduction, waiting, and processing. In a traditional development process, multiple engineers are busy building multiple features based on the last bit of stable code. When they try to deploy their feature after two weeks of work, they find that someone else deployed a different feature the previous day and the
two features don‘t play well together. Continuous deployment allows engineers to upload their work instantaneously – thus ensuring engineers are always working from the same base code. This avoids spending extra weeks making the feature code compatible.
Lean Principle #3: Make Value Flow at the Pull of the Customer
IMVU projects have an eight week Return on Investment (ROI) target. Whenever someone suggests a small project, they are asked to provide a general roadmap showing that the project could repay the time investment in eight weeks. Projects are continuously tested on small numbers of IMVU users –who often had no idea they were part of a bucket test. If a project shows success, they keep working on it.
After a few weeks, if the numbers shows the project had zero chance of positive ROI, it is shut down immediately. Over time, as IMVU matures, this project ROI target is expanded:
Lean Principle #4: Involve and Empower
Employees IMVU implemented the 5 Why‘s process, also known as ―Root cause analysis, to involve and empower its employees during trouble-shooting processes. 5 Why‘s process is the technique of asking why five times to get to the root cause of a problem when it occurs.
in blog posts by Ries, each IMVU engineer has his/her own sandbox which mimicked
production as close as possible. IMVU has a comprehensive set of unit, acceptance, functional, and performance tests, and practiced Test-Drive-Development across the whole team. Engineers build a series of test tags, and quickly run a subset of tests in their sandboxes. Revisions are required if a test fails. To keep developers on the same code before it passed the various tests, IMVU created the equivalent of a Kanban system plus an Andon cord (automated testing and immediate rollback system). Developers are assigned a single task, and not allowed to move onto the next task until their code not only successfully passes the automated testing, but also has successfully deployed. Only then, they can pull the next task from the queue. This means that developers have a little bit of idle time while the tests were running. It also means that code is fully completed before a developer moves on. As a result, engineering is optimized for productivity rather than activity:
Lean Principle #5: Continuously Improve in Pursuit of Perfection
The problem with all this emphasis on ―ship, ship, ship, was different bugs in the code kept taking the site down. Sometimes it was simply a scaling issue— new upgrades worked fine on an engineer‘s computer, but crashed when hundreds of thousands of users tried it. Other times, it was a new employee releasing some feature without understanding how the previous code base worked. From a business perspective, it didn‘t matter what the problem was; if the site was down, IMVU was losing money.
From a technical perspective, each new problem required a different solution. Solving scaling issues is very different than solving a single infinite loop problem. The only practical fix was either cease continuous deployment or institute automated tests that checked the code, plus allowed for immediate code rollbacks if any server started to crash.
Eventually, IMVU architected a series of automated tests that looked at every new code check-in, tested it, and then pushed it onto the live servers. If at any point the code crashed—either during testing or once it started running in the wild—the automated tests instituted a rollback to the last verified good version, and sent a nice little e-mail back to the engineer that said ―We‘re sorry, but it looks like your code ABC caused a problem at XYZ. Afraid we can‘t let your code go live until this is fixed. As a result, the automated testing caught an amazing number of errors, and IMVU management started pursuing massively high quality expectations.
IMVU Successfully implemented lean principles at the technical level in the software development process. They encountered many common challenges that software companies face: choosing the right product feature, long development cycle, endless testing and debugging. IMVU found solutions by sticking with the basic lean principles. They were able to identify and reduce common wastes in software development process, specifically, overproduction, waiting, process, and defects.
IMVU clearly demonstrated the importance of lean implementation in the software development process.
The implementation of lean principles cannot turn software development into a production line environment, with scientific methods for each step of the way. However, it can help turn a chaotic, constantly changing process, into a much more predictable, fast moving, and streamlined process. Lean implementation coupled with brilliant designs and fully engaged intellectual team can help deliver great software products.
It would seem that the rapid release cycles called for by lean principles can only be effective if there is a comprehensive and rigorous testing environment. An interesting question is whether IMVU‘s practices (such as daily release online) would be applicable to software companies that focus on packaged rather than online products. In this case, the ―customer is a combination of the other developers and the ultimate consumer. IMVU‘s experience challenges the conventional wisdom in software development. Can it be beneficial to all software companies striving to deliver the right product, at the right time, and at the right price? Middleton and Sutton believe that the benefits work across different types of software. Yet, they also recognize that lean software is far too early in its evolution.
Lean Beyond Agile